Installing a New AC: What Happens and What to Ask Your Installer

What actually happens during an AC installation in Dubai, from site check to commissioning, and the questions worth asking your installer before work starts.

By
Al Naveed AC team
Published
Reading time
6 minutes
Category
HVAC Guides

Buying the right air conditioner is only half the job. How it is installed decides how well it cools, how long it lasts, and whether you end up calling someone back within the first year to fix a problem that installation caused. Most of what goes wrong with a new unit traces back to a step in the installation that was rushed or skipped, not to the unit itself.

Knowing roughly what should happen, in what order, makes it easier to tell a careful installation from a quick one, and gives you the right questions to ask before anyone starts drilling.

The site check comes first

Before any mounting happens, a technician should look at where the indoor and outdoor units will go, the route the pipework will take between them, where the condensate drain will run to, and what the electrical supply can handle. This decides almost everything that follows, so it is worth being wary of anyone who wants to skip straight to fitting brackets.

  • The outdoor unit needs open space around it so it can release heat. A spot boxed in by walls or stacked with other equipment runs hotter and works harder for years afterwards.
  • The pipe run between indoor and outdoor units should be as short and direct as sensible. A longer run is sometimes unavoidable, but it affects how the system performs.
  • The drain line needs a continuous downward slope the whole way to wherever it discharges. Even a short section that is flat or sloped the wrong way causes water to back up later.
  • The electrical supply and isolator need to suit the unit's power draw, not just have a spare socket nearby.

Mounting the units

The indoor unit is fixed level to a wall bracket or into a ceiling void, and the outdoor unit onto a wall bracket, a frame or the ground, depending on where it sits. A unit that is not level drains unevenly, which shows up later as a drip from one corner rather than a clean run of water down the pipe.

In apartments, the outdoor unit's position is often constrained by what the building allows, so this stage sometimes depends on getting approval from building management before work can even begin.

Pipework, insulation and the vacuum

Copper pipework carries refrigerant between the two units and is wrapped in insulation to stop it sweating or losing its cooling along the way. Once the pipework and connections are complete, the system is vacuumed before any refrigerant is released into it.

Electrical connection and the drain

The unit is wired to its own isolator and, through that, to the property's electrical supply. The condensate drain line is connected and run to its discharge point, following the slope agreed during the site check. Both of these are checked again once the system is running, since a fault here shows up quickly, within the first cycle of use.

Commissioning and the leak check

Once everything is connected, refrigerant is released into the system and every joint is checked for leaks, usually with a leak detector or a soap solution at each connection. The unit is then run and the cooling, the drainage and the controls are all tested before the installer leaves.

A proper commissioning includes a run-through of the controls, so you know how to operate the unit, change its modes and read any error codes it might show later, rather than being handed a remote with no explanation.

Getting the size right before any of this starts

None of the steps above matter much if the unit itself is the wrong size for the room. A unit that is too small never quite reaches the set temperature and runs constantly trying. A unit that is too large cools the air fast, switches off, and leaves the room feeling clammy because it never runs long enough to remove the humidity.

Room size is the starting point, but ceiling height, how much sun the room gets, how many people usually use it and whether it sits above or below other air-conditioned space all change the right capacity. This is worth discussing with whoever is installing the unit before you buy it, not after.

Questions worth asking your installer

  1. How did you decide on the capacity for this room, and what did you take into account?
  2. Where will the outdoor unit sit, and does it have enough space around it?
  3. What is the slope of the drain line, and where does it discharge?
  4. Will the pipework be vacuumed before the refrigerant goes in, and for how long?
  5. Will you show me how the controls work once it is running?
  6. Do I need permission from building management or a landlord before this work starts?

An installer who can answer these clearly, without needing to check anything, is generally one who is doing the job properly. These same questions are useful again at the end of the visit, to confirm that what was planned is actually what was done.

What happens to the old unit

When a replacement is going into a space that already had an air conditioner, the old unit needs to come down safely before the new one goes up. Any refrigerant left in the old system is recovered rather than released into the air, and the old pipework is checked rather than automatically reused, since corrosion or the wrong diameter in an existing pipe run can undermine a brand-new unit's performance from the first day.

It is worth asking in advance whether the old unit will be removed and taken away as part of the job, or whether that is something you need to arrange separately, so there is no surprise about a disconnected unit sitting in a corner once the new one is running.

What a careful installer leaves you with

Once the work is finished, you should be able to see where the drain discharges, know which breaker controls the unit, and understand how to switch between cooling modes without guessing. If the unit has a model number or label that you might need later, note it down or photograph it while access is easy, rather than trying to find it behind a mounted unit months afterwards.

Checking building rules before the date

Many buildings in Dubai have their own rules about where outdoor units can be placed, when drilling is allowed, and whether contractors need to register with building management first. Tenants in particular usually need the landlord's agreement before any new installation. Settling this before the day you book keeps the job from stalling halfway through.

Choosing when to book the work

An installation during a cooler, quieter month tends to be a calmer job all round, with less pressure to rush a vacuum step or a leak check because a household is already sweating through the wait. If a new unit is going into a room you are not using daily, such as a spare bedroom or an office that is being fitted out, there is rarely a reason to leave the booking until the last comfortable week before summer, when demand across the city rises sharply.

Settling in during the first few weeks

A newly installed unit is worth paying slightly closer attention to for its first few weeks of regular use. Note how quickly it reaches the set temperature, whether the drain line is working by checking that no water appears anywhere it should not, and whether the outdoor unit sounds normal once it has been running under real summer load rather than just during the short test at commissioning. Anything that seems off in this early period is easier to trace back to the installation itself while the work is still fresh and easy to reference.